An installation is decided by the counter before the fixture is unpacked. Hole spacing, deck thickness and the state of two angle stops determine whether the work is a single visit, and none of them can be judged from the showroom.
Match the holes
Bathroom centerset taps use three holes at 4-inch centers. A widespread sets the same three holes further apart across the sink. Kitchen taps vary more: one hole for a simple tap, up to four when a sprayer and soap dispenser share the deck.
A base narrower than the old footprint leaves holes to cover; a base wider than the pattern means drilling or exchanging the fixture. Sealant does not bridge a gap in the deck.
Check the shank and the deck
The threaded shank is a fixed length. Thick stone can use most of it and leave too little for the nut. Thin stainless can flex beneath a tall pull-down unless a stabilizer plate spreads the load.
Measure the counter at the hole and compare it with the fixture's stated maximum deck thickness. This is the check that prevents a second visit.
Flush before you fit
La Habra's city water is very hard, and supply lines that have sat closed can hold grit and mineral debris. Running the supply into a bucket before the new fixture is connected keeps that material out of the cartridge and the aerator, where it would cause a drip or a weak stream within days.
Permits
The city's Building & Safety counter and its online permit portal are the route for a permit question. Whether a fixture swap needs one depends on the scope, and the counter decides for the address. Planning review can come before plan check on larger work.
Water and the supplier
The City of La Habra Water Division supplies most of the city, and Suburban Water Systems and La Habra Heights County Water District serve portions. The bill identifies the supplier for an address, and that company is the contact if a meter valve will not close during the shutoff. Water-quality questions belong to the city's Water/Sewer Division rather than a plumbing contractor.
Test and check the aerator
Exercise hot, cold, the swivel and the sprayer, then dry-check the base, supply nuts and drain. Remove and rinse the new aerator screen after the first week; at 16 grains per gallon it will already be collecting scale.